Reports

Deliverables that help maintenance teams act on findings instead of filing away a generic PDF.

Reports are positioned to include executive summaries, thermal and visual image pairs, severity, likely concern area, recommended next action, and a structure that supports annual trend data and rescans.

Report Preview

01

Executive Summary

02

Asset Register

03

Thermal Finding Sheet

04

Risk Priority Matrix

05

Recommended Corrective Actions

06

Sensor Placement Plan

07

Repair Verification Addendum

08

Recurring Inspection History

Executive Summary

Asset Register

Thermal Finding Sheet

Recommended Corrective Actions

Sensor Placement Plan

Repair Verification Addendum

Recurring Inspection History

Management-ready PDF delivery

Visible Image Placeholder

Thermal Image Placeholder

Asset ID: MCC-3A-27Priority 2 - Serious

480V breaker termination

Planer building, MCC room north wall

Observed Condition
Elevated heat at one lug relative to adjacent phases under normal operating load.
Temperature Delta
38F above comparable phase connection
Probable Cause
Loose or degraded connection with developing resistance heat.
Recommended Action
Have qualified electrical personnel inspect, torque-check, and repair as needed during the next practical shutdown window.
Follow-up Needed
Post-repair rescan recommended

Risk Priority Matrix

Priority 1

Critical

Immediate safety, fire, shutdown, or equipment failure concern.

Priority 2

Serious

Repair should be scheduled promptly.

Priority 3

Monitor

Abnormal condition; recheck under operating load or during next inspection cycle.

Priority 4

Baseline

No actionable anomaly observed; retain as reference record.

Request an Inspection

Build a repeatable infrared inspection program around your highest-risk electrical assets.

Start with a facility scan, align around safe access and operating conditions, and turn findings into planned maintenance follow-up instead of surprise downtime and emergency reaction work.