Sample Report
Reporting that gives maintenance teams something they can actually act on.
A redacted report sample will be added once approved field examples are available. For now, the site explains the report structure and severity approach without publishing any real client data.
Visible Image Placeholder
Thermal Image Placeholder
Main disconnect termination
Main switchgear room, service entrance line-up
- Observed Condition
- Noticeable hotspot at one termination compared with adjacent comparable points.
- Temperature Delta
- 29F above adjacent connection
- Probable Cause
- Possible loose connection or increasing resistance under load.
- Recommended Action
- Review and repair by qualified electrical personnel at the next safe maintenance opportunity.
- Follow-up Needed
- Rescan after corrective work
Risk Priority Matrix
Priority 1
Critical
Immediate safety, fire, shutdown, or equipment failure concern.
Priority 2
Serious
Repair should be scheduled promptly.
Priority 3
Monitor
Abnormal condition; recheck under operating load or during next inspection cycle.
Priority 4
Baseline
No actionable anomaly observed; retain as reference record.
Request an Inspection
Build a repeatable infrared inspection program around your highest-risk electrical assets.
Start with a facility scan, align around safe access and operating conditions, and turn findings into planned maintenance follow-up instead of surprise downtime and emergency reaction work.